Planning
Engineering work packages connected to the construction schedule, so document and submission dates follow the plan instead of trailing it.

Key features
Work package breakdown structure
Baseline and pace variance tracking per activity
Look-ahead views for engineering deliverables
Planned vs actual deliverable dates
Critical-path risk flagging
Typical workflow
01Import the schedule using the Planning Template
02Map activities to engineering work packages
03Capture a baseline and track variance against it
04Review the look-ahead each week